Skip to content

SYSTEM 02 — SOLAR EPC OPERATIONS

From site to officein real time.

Your project manager shouldn't be a WhatsApp middleman. We built the layer that sits between your field engineers and your office — so updates flow automatically, milestones get logged, and your clients always know where the project stands.

Solar EPC pilot, Rajasthan: 10+ daily status calls eliminated in the first 2 weeks.

Operations Intel
Rajasthan Industrial | SL-99
14:02:44In-Sync
Project Step 01

Lead

Status
MILESTONE ACTIVE

New industrial inquiry captured from Rajasthan cluster.

Site EngineerVikram Singh
Health MetricOPTIMAL
Lead
Survey
Quotation
Booking
Dispatch
Installation
Net Metering
Live
Global Pipeline
94.8%
Generation1.4 MW

The Problem

The site update that never arrived.

Your project manager calls the site engineer. The site engineer is in a meeting. The client calls you. You call the engineer again. This is your day.

  • !Daily status call chains
  • !WhatsApp-to-spreadsheet manual copying
  • !Client reports built by hand
  • !Milestone delays caught late
0+DAILY STATUS CALLS ELIMINATEDEPC Pilot, Rajasthan

How It Works

PHASE 01

Field engineers send updates through the dedicated app — text, photo, or structured milestone form. The system processes it instantly and logs to the central dashboard. Updates happen in the field. No WhatsApp chains. No manual re-entry.

PHASE 02

Project dashboard updates in real time. All stakeholders see progress without needing to ask. Exception alerts trigger automatically on delays.

PHASE 03

Client reports generated automatically at set intervals. Your team reviews before sending — or sets it to auto-send.

Built For

Industry Specific Protocol

Built for operations where the work happens far from the office. Same system, configured for your project structure and milestone definitions.

Solar EPC companies

Construction contractors

Infrastructure project managers

Any field-to-office operation

Stop managing the update chain.

A 30-minute audit maps which part of your field operation costs the most time to manage manually.

Book a Free Audit
Book a Free Audit